t u r n e x

V6 90mm

Scope of Work

Which of us ever undertakes laborious physical exercise, except to obtain some advantage from it but who has any right but we must explain to you how all this mistaken idea of denouncing pleasure and praising pain was born and I will give you a complete account of the system.

  • Site Preparation and Foundation Work
  • Titanium Arch Construction
  • Design and Aesthetic Detailing
  • Safety and Testing

Challenges & Solutions

The project faced material, weather, and urban integration challenges, resolved through advanced fabrication, resilient design, and seamless collaboration with city planners.

Material Strength

Working with titanium presented challenges in terms of manufacturing and welding. Advanced precision tools and techniques have been implemented.

Urban Integration

Seamlessly integrating the arch into the existing city infrastructure while maintaining its grandeur required careful planning and collaboration with urban planners.